Commercial data drops
A cable to each desk, till, camera, reader and access point. The drop is labelled at the faceplate and at the rack, so a later move is a number, not a search through the ceiling.
Networking
Commercial data drops, access points, network racks and servers, plus the cabling the cameras and door readers sit on. Everything is labelled before we leave.

What is on the system
A cable to each desk, till, camera, reader and access point. The drop is labelled at the faceplate and at the rack, so a later move is a number, not a search through the ceiling.
Wireless is planned for the rooms that need it: a sales floor, an office, a warehouse aisle. One access point in a closet does not cover a building. The proposal shows where each one goes.
A rack or a cabinet for the switch, the patch panel, the recorder and the power. Cables are dressed and labelled. The next service call should not start by pulling a bundle apart.
A server only when the site needs one: local recording, door software, or files that have to stay in the building. It is mounted, labelled and left with the logins in the client's name.
Cameras, readers and access points need power as well as data. The proposal says what is powered from the switch and what needs a supply of its own.
An empty building is cabled before the ceiling closes. An open shop or office is cabled around the hours it is in use. The proposal says which, and what will be visible when the work is done.
By property
Drops at the till, the office and the stock room, an access point on the floor, and a small rack the recorder and the switch share.
Drops at the office and the dock desk, access points along the aisles that need them, and a rack that is not buried behind stored product.
A drop at each workstation, access points for the floors people actually sit on, and a rack or closet where the switch, the patch panel and any server live.
Drops where a recorder, a desk or a television needs a cable, and an access point where the wireless does not reach. A full rack is used only when the equipment calls for one.
Cable that is already in the walls is tested before it is replaced. If a run is sound, it stays. The proposal lists the new drops, the access points, the rack and any server on their own lines.
Ask about cabling for this building